Brisbane Ship Constructions CORPORATE PROFILE


QUALITY ASSURANCE




QUALITY ASSURANCE

The BSC MARINE GROUP applies Quality Assurance practices to ISO 9001. 

Our management and quality assurance system centres around proprietary software named  "SHIPSHAPE" founded in 1994 and developed fully in-house.  The prototype design of this software, with "deemed mandatory features" unable to be found in any existing commercial software, went live in 1996 and after some two months of operating in parallel with existing systems the umbilical cord was cut and the system went stand-alone. Since that time it has operated without downtime. The system, running firstly on a Novell network (presently Linux), seamlessly integrates our design office with the production floor with real time control and management in relation to design / requisitioning, purchasing and receiving of goods / production and job management / and document registration and control.

SHIPSHAPE was conceived as a computer networked "paperleast QA system" effectively integrating all quality assurance aspects of our business.  Besides drawings and job sheets; our production team uses a single pre-numbered controlled QA document called an "ARF" (Action Request Form) with tick boxes to account for it's document type / nature of action request.

SHIPSHAPE provides for timely reporting and control of all our internal and external documentation and correspondence; including project specifications, drawings, procedures and work instructions, inspection and test plans (ITP's), incl. the control of revisions to the above),  job codes for time recording, production scheduling, non-conformance reporting, design change requests, surveyor comments, rules and regulations, external standards, meeting minutes, product R&D, product specifications, bill of materials, quotations, requisitioning of goods, ordering/purchasing system, receiving of goods.

Our quality control in design R&D, new vessel prototyping, and product integrity is achieved by design due diligence, compliance with standards, and by testing and correction if required. Our aim is to produce consistent, commercial, high quality components and products from one project to another.

QA Policy Manual and QA Procedures Documentation was completed by April 1998 and our formalised QA System has been in operation since that time.

 

Outline of SHIPSHAPE system

SHIPSHAPE is an integrated management information system providing timely and relevant information for the purpose of managing and assuring our quality and for effective management control of the ship design, marketing and building process. An outcome of any systematic approach such as SHIPSHAPE is that productivity is greatly increased by the effective and timely communication of objectives; budgets and daily tasks.

  1. Organisational Structure
  2. Projects
  3. Design
  4. Production
  5. Products
  6. Purchasing
  7. Stores / Receiving of Goods
  8. Document Registration and Filing Systems
  9. Action Management
  10. Contacts
  11. Data Structures

 

 

SHIPSHAPE Organisational Structure

  1. Cost Centres and Cost Centre Managers
  2. Departments and Department Co-ordinators
  3. Project Manager(s)
  4. Activity and KPI reporting by responsibility area

 

SHIPSHAPE Projects

  1. Project Register (by Business Activity)
  2. Project Management tools and reporting incl. integrated Contact Logs / Actions / Principal Particulars / Specifications / Review notes and comments / Records and attachment of electronic files
  3. Filtering by Type / Cost Centre / Region (for marketing) / Active status

 

SHIPSHAPE Design 

  1. Design Projects
  2. Drawing Register
  3. Action Request Form (ARF)
  4. Drawing Revisons
  5. Drawings review tracking and reporting
  6. Drawing Coding to Projects and Job Codes / Job Sheets
  7. Drawing Issues (controlled and uncontrolled)
  8. Design Management and Reporting
  9. Drafting Management and Reporting

 

SHIPSHAPE Production

  1. Production Scheduling system.
  2. Project Activity plans by Job Code; incl. Components, Jobs (subcomponents), and Tasks; incl. the integration of this structure with Project Specifications / Drawings / BOM's / Purchasing and Delivery Summary / Inspection and Test Plan / Rules and Regs / Standards / Procedures.
  3. Labour/Time Management for each Job Code Activity structure incl. budgeting / %age completion / actual hours to date / completion forecasting / comments re. delays holdups / critical path required completion date  
  4. Action request Forms (ARF's)
  5. Daily Job WIP list and codes for time recording
  6. Daily Timesheets 
  7. Reports

 

SHIPSHAPE Products

  1. Product Listing by Category / Type / Sub-type
  2. Integrated information for products:
  • purchasing history (incl. quotes) by product

  • brands

  • product information and specifications

  • units of measure (supply and purchasing)

  • attachment of electronic files / pdf's

 

SHIPSHAPE Purchasing 

  1. Purchasing Register and Database
  2. Request for Goods (RFG) / Specification Bill of materials ("BOM") / Job Sheet BOM / Direct
  3. Quotation Request ("quick" versus product table lookup)
  4. Purchase Requisition
  5. Purchase Order

 

SHIPSHAPE Stores / Receiving of Goods 

  1. Outstanding Orders management and reporting
  2. Stores / Receiving of Goods (Partial versus Full Receipt of Goods)
  3. Receipting of Documents required with Purchased Goods
  4. Receiving of Plant and Equipment
  5. P&E Register

 

SHIPSHAPE Document Registration and Filing Systems 

  1. Transmittal Register
  2. Outlook (email) Integration and Filing System
  3. Filing System - Paper based records
  4. Filing System - Electronic Records (other than email)
  5. Record Coding System

 

 

Transmittal Register

  1. Record Source (Outgoing / Incoming / Internal / ARF)
  2. Record Types (Paper based / eMail)
  3. Record Actioning system
  4. Record Distribution system

 

Outlook (email) Integration

  1. Select Outlook folder and import to ShipShape database
  2. Validate to ShipShape CRM database
  3. Auto and manual coding of emails
  4. email management tools incl. blacklisting, actioning

 

Filing System - Paper Based records

  1. File Types (Entity / Subject / E&C / Register)
  2. File indexing (DRN / FRN)
  3. File Contents Reports
  4. File Audit

 

Filing system - Electronic Records (other than email)

  1. import electronic file(s) (either individually or batch import for a selected directory - local drive or network drive)
  2. record essentials - link Author to CRM database / record date.
  3. record coding

 

Record Coding Systems

  1. Coding to Projects
  2. Coding to Job Codes
  3. Coding to Departments
  4. Coding to Registers
  5. Coding to Product Categories and/or Brands
  6. Coding to Vessel types

 

 

SHIPSHAPE Action Management

  1. Actions Register
  2. Creating an Action
  3. Integrated Coding to Projects / Job Codes / Departments
  4. Delegation and/or Communication of Action
  5. Completing an Action
  6. "Action(s) Outstanding" management and reporting

 

SHIPSHAPE Contacts

  1. Contact types - Entity / Employees and Contractors / Individuals 
  2. Contacts Register
  3. Contacts Register Coding
  4. Contact Log

 

Contacts Register Coding

  1. Cost centre coding
  2. Supplier of Product
  3. Relationship(s)
  4. Representatives
  5. Supplier Brand Management

 

Contact Log

  1. Entering a Contact Log
  2. Log Coding  (project / job coding / department coding)
  3. Log Action
  4. Log e-mail communication
   


Home | DESIGN HOME PAGE | E-mail

CORPORATE PROFILE | BACKGROUND | PROJECTS  | QUALITY ASSURANCE | WORKMANSHIP | FACILITIES | CONTACT DETAILS
© Copyright 1995 - 2007, BSC Marine Group, All Rights Reserved.